Introduction:
In aerospace connector pin manufacturing (as shown in Figure 1), meeting stringent 96-hour salt spray test requirements presents a significant technical challenge. While most industry standards only require 48-72 hours of resistance, SPierson has developed a reliable dual-plating process that consistently achieves the demanding 96-hour standard.
The Challenge:
• Standard silver plating typically fails at 48-72 hours in salt spray testing
• Aerospace applications demand superior corrosion resistance
• Traditional methods cannot guarantee consistent 96-hour performance
SPierson's Innovative Solution:
Our proven two-step plating process:
1. Base Layer - Precision Nickel Plating:
- Creates a corrosion-resistant foundation
- Thickness controlled to 5-8μm
- Provides excellent adhesion for silver layer
2. Top Layer - High-Purity Silver Plating:
- 99.9% pure silver deposition
- Optimal thickness of 3-5μm
- Maintains superior electrical conductivity
Technical Advantages:
✓ Consistent 96+ hour salt spray performance
✓ Excellent wear resistance
✓ Maintains low contact resistance (<5mΩ)
✓ No peeling or blistering after testing
Process Validation:
- Tested per ASTM B117 standard
- 100% batch testing implementation
- Third-party verification available

